Open main menu
Home
Random
Log in
Settings
About Railway Operation Simulator Wiki
Disclaimers
Railway Operation Simulator Wiki
Search
Changes
← Older edit
Fujikyuko Railway
(view source)
Revision as of 12:26, 6 April 2025
14 bytes removed
,
12:26, 6 April 2025
no edit summary
Line 20:
Line 20:
* All the depot movements are to be carried out under signaller control.
* All the depot movements are to be carried out under signaller control.
* JR Fuji Excursion trains originating in Shinjuku must enter the railway through the JR Otsuki link.
* JR Fuji Excursion trains originating in Shinjuku must enter the railway through the JR Otsuki link.
−
−
== Trivia ==
[[Category:Simulations in {{#ifeq:Japan|United Kingdom|the|}} Japan]]
[[Category:Simulations in {{#ifeq:Japan|United Kingdom|the|}} Japan]]
[[Category:Fuji Kyuko]]
[[Category:Fuji Kyuko]]
Krizar
confirmed, superuser,
Administrators
838
edits