Changes

Jump to navigation Jump to search
14 bytes removed ,  12:26, 6 April 2025
no edit summary
Line 20: Line 20:  
* All the depot movements are to be carried out under signaller control.
 
* All the depot movements are to be carried out under signaller control.
 
* JR Fuji Excursion trains originating in Shinjuku must enter the railway through the JR Otsuki link.
 
* JR Fuji Excursion trains originating in Shinjuku must enter the railway through the JR Otsuki link.
  −
== Trivia ==
      
[[Category:Simulations in {{#ifeq:Japan|United Kingdom|the|}} Japan]]
 
[[Category:Simulations in {{#ifeq:Japan|United Kingdom|the|}} Japan]]
 
[[Category:Fuji Kyuko]]
 
[[Category:Fuji Kyuko]]
confirmed, superuser, Administrators
838

edits

Navigation menu