| Line 1: |
Line 1: |
| | {{Infobox ROSProject | | {{Infobox ROSProject |
| | | name = {{PAGENAME}} | | | name = {{PAGENAME}} |
| − | | description = | + | | description = This is a simulation based on the Reading Station area correct as at April 2015. |
| | | country = {{flagu|United Kingdom}} | | | country = {{flagu|United Kingdom}} |
| | | time_period = 2015 | | | time_period = 2015 |
| − | | company = Great Western Railway | + | | company = Great Western Railway, South West Trains |
| | | rolling_stock = | | | rolling_stock = |
| − | * | + | * [[Diesel Multiple Units of the United Kingdom#Class 150|Class 150]] |
| − | * | + | * [[Diesel Multiple Units of the United Kingdom#Class 165|Class 165]] |
| | + | * [[Diesel Multiple Units of the United Kingdom#Class 166|Class 166]] |
| | + | * [[Electric Multiple Units of the United Kingdom#Class 458|Class 458]] |
| | + | * [[Loco Hauled Consists of the United Kingdom#Class 43 + 8*Mk3|Class 43 + 8*Mk3]] |
| | | difficulty = 6 | | | difficulty = 6 |
| | | author = Carwyn Thomas | | | author = Carwyn Thomas |
| − | | repository = [________ {{PAGENAME}}]
| + | | website = [https://www.railwayoperationsimulator.com/catalog/community-projects/united-kingdom/reading-2015 {{PAGENAME}}] |
| − | | website = [________ {{PAGENAME}}] | |
| | | map = {{{{PAGENAME}} Route}} | | | map = {{{{PAGENAME}} Route}} |
| | }} | | }} |
| | + | This is a simulation based on the Reading Station area correct as at April 2015. |
| | | | |
| | == Timetable == | | == Timetable == |
| | + | The timetable included is the Working Timetable for June 1st 2015 and includes all services that were due to operate on this day, also included are ‘Runs as Required’ Freight services just to add extra operational interest. On this given day the relief lines and Westbury lines were closed from around 22:00 onwards which involves additional use of Kennet Bridge Junction and Tilehurst East Junction. |
| | + | |
| | + | One alteration made is that the Down Relief Speed has been increased to allow stopping trains to arrive Tilehurst on time otherwise a late arrival will be recorded, just as they currently are in real life. The real increase of speed on this section was carried out later that year. |
| | | | |
| | {| class="wikitable" | | {| class="wikitable" |
| Line 22: |
Line 28: |
| | | style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)''' | | | style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)''' |
| | |- | | |- |
| − | | rowspan="2"; style="background:#{{National Rail colour|Great Western Railway}}; color: white" | Great Western Railway | + | | rowspan="11"; style="background:#{{National Rail colour|Great Western Railway}}; color: white" | Great Western Railway |
| − | | | + | | rowspan="8" | London Paddington || Cardiff Central || 1 |
| | + | |- |
| | + | | Swansea || 1 |
| | + | |- |
| | + | | Bristol Temple Meads || 2 |
| | + | |- |
| | + | | Plymouth || 0.5 |
| | + | |- |
| | + | | Penzance || 0.5 |
| | + | |- |
| | + | | Cheltenham Spa || 0.5 |
| | + | |- |
| | + | | Oxford || 4 |
| | + | |- |
| | + | | rowspan="5" | Reading || 2 |
| | + | |- |
| | + | | Basingstoke || 2 |
| | + | |- |
| | + | | Redhill || 1 |
| | + | |- |
| | + | | Gatwick Airport || 1 |
| | + | |- |
| | + | | style="background:#{{National Rail colour|South West Trains}}; color: white" | South West Trains |
| | + | | London Waterloo || 2 |
| | |} | | |} |
| | | | |
| | == Operational Tips == | | == Operational Tips == |
| | + | For additional help all trains that have a timing point at both Tilehurst Station and Reading West Junction use the Tilehurst East Crossover. |
| | | | |
| − | == Trivia ==
| + | There are a couple of occasions when trains in Platforms 14/15 will need to be manually moved using the ‘Step forward one element’ feature to ensure that they are not fouling the Departure signal. |
| − | | |
| − | [[Category:Simulations in {{#ifeq:United Kingdom|United Kingdom|the|}}{{#ifeq:United Kingdom|Netherlands|the|}}{{#ifeq:United Kingdom|United States of America|the|}} United Kingdom]]
| |
| − | [[Category:Great Western Railway]]
| |