Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1: −
The Actions Due Panel is a feature of [[Railway Operation Simulator]] which provides an overview of future action requirements listed as the relevant service identifier alongside a countdown to the point at which the service will be affected by a signal held at danger. Such actions typically require the operator to define an onward path ahead of the service.
+
The Actions Due Panel is a feature of [[Railway Operation Simulator]] which provides an overview of future action requirements, these are listed as the relevant service identifier, alongside a countdown to the point at which the service will be affected by a signal held at danger. Such actions typically require the operator to define an onward path ahead of the service.
confirmed, superuser, Administrators
838

edits

Navigation menu