Changes

Jump to navigation Jump to search
379 bytes added ,  23:33, 26 August 2022
no edit summary
Line 5: Line 5:  
| time_period = 2010s
 
| time_period = 2010s
 
| company    = Heathrow Express, Heathrow Connect, London Underground
 
| company    = Heathrow Express, Heathrow Connect, London Underground
 +
| rolling_stock =
 +
* [[Electric Multiple Units of the United Kingdom#Class 332|Class 332]]
 +
* [[Electric Multiple Units of the United Kingdom#Class 360|Class 360]]
 +
* [[London Underground Multiple Units#1973 Stock|LU 1973 Stock]]
 
| difficulty  = 4
 
| difficulty  = 4
 
| author      = JK
 
| author      = JK
 
| website    = [https://www.railwayoperationsimulator.com/catalog/community-projects/united-kingdom/heathrow Heathrow]
 
| website    = [https://www.railwayoperationsimulator.com/catalog/community-projects/united-kingdom/heathrow Heathrow]
| map        = [[Heathrow Route]]
+
| map        = {{Heathrow Route}}
 
}}
 
}}
 
This railway includes mainline and LU Piccadilly line services to all three Heathrow stations.
 
This railway includes mainline and LU Piccadilly line services to all three Heathrow stations.
Line 36: Line 40:  
== Operational Tips ==
 
== Operational Tips ==
 
If automatic signal routes are preset then it is advisable to delete the short section from the Paddington entry point to the signal just before the bottom Terminal 123 platform.  This is because shuttle service routes need to be set from Terminal 4 to the exit signal at the bottom Terminal 123 platform, which is adjacent to this platform’s entry signal for trains from Paddington, and the program won’t allow routes in opposite directions to finish adjacent to each other.
 
If automatic signal routes are preset then it is advisable to delete the short section from the Paddington entry point to the signal just before the bottom Terminal 123 platform.  This is because shuttle service routes need to be set from Terminal 4 to the exit signal at the bottom Terminal 123 platform, which is adjacent to this platform’s entry signal for trains from Paddington, and the program won’t allow routes in opposite directions to finish adjacent to each other.
 +
 +
[[Category:Simulations in the United Kingdom]]
 +
[[Category:London Underground Simulations]]
 +
[[Category:Heathrow Connect]]
 +
[[Category:Heathrow Express]]
confirmed, superuser, Administrators
1,552

edits

Navigation menu