Changes

no edit summary
Line 71: Line 71:  
Due to the custom nature of the timetable, an excel spreadsheet was used to graph the services to fit around each other. As the line includes several single track sections, this has been included in the download to help with determining where trains should pass each other. It also shows slightly further each side, with trains at Aldershot, Eastleigh and Fareham all considered to ensure the proposed service fits.
 
Due to the custom nature of the timetable, an excel spreadsheet was used to graph the services to fit around each other. As the line includes several single track sections, this has been included in the download to help with determining where trains should pass each other. It also shows slightly further each side, with trains at Aldershot, Eastleigh and Fareham all considered to ensure the proposed service fits.
   −
[[Category:Fictional Simulations]]
+
[[Category:Fictional simulations]]
 
[[Category:South Western Railway]]
 
[[Category:South Western Railway]]
 
[[Category:CrossCountry]]
 
[[Category:CrossCountry]]
confirmed, superuser, Administrators
1,177

edits