Changes

no edit summary
Line 5: Line 5:  
| time_period = 2010s
 
| time_period = 2010s
 
| company    = South Western Railway
 
| company    = South Western Railway
 +
| rolling_stock =
 +
* [[Electric Multiple Units of the United Kingdom#Class 444|Class 444]]
 +
* [[Electric Multiple Units of the United Kingdom#Class 450|Class 450]]
 
| difficulty  = 6
 
| difficulty  = 6
 
| author      = [[User:Oxalin|Oxalin]]
 
| author      = [[User:Oxalin|Oxalin]]
Line 14: Line 17:  
The majority of the line is a simple two track route, however Haslemere station in the middle has three platforms which can be used for services to overtake each other, and terminate. The route also has several level crossings, which increase the difficulty slightly.
 
The majority of the line is a simple two track route, however Haslemere station in the middle has three platforms which can be used for services to overtake each other, and terminate. The route also has several level crossings, which increase the difficulty slightly.
    +
== Timetable ==
 
The standard service pattern is as follows:
 
The standard service pattern is as follows:
   Line 28: Line 32:  
| Haslemere || 1
 
| Haslemere || 1
 
|}
 
|}
 +
 +
Several additional peak services operate, and one CrossCountry empty coaching stock move runs each way during the day.
 +
 +
== Operational Tips ==
 +
Keep an eye on departure times from Haslemere - especially heading south trains overtake each other here. Typically the train with the longer dwell should be routed into platform 2 (the middle platform), although sometimes other services don’t allow this, so be careful!
    
[[Category:Simulations in the United Kingdom]]
 
[[Category:Simulations in the United Kingdom]]
 
[[Category:South Western Railway]]
 
[[Category:South Western Railway]]
confirmed, superuser, Administrators
1,177

edits