Changes

18 bytes added ,  15:01, 6 April 2022
m
no edit summary
Line 52: Line 52:     
=== Weekend Engineering ===
 
=== Weekend Engineering ===
 +
''Added v1.1.0''
 +
 
A second timetable has been included simulating the engineering works on 3rd April 2022. This included a rare closure of all lines on Portsea island, meaning most services terminated at Havant instead. Being a Sunday, less services are scheduled, but there's still plenty to keep the signaller occupied!
 
A second timetable has been included simulating the engineering works on 3rd April 2022. This included a rare closure of all lines on Portsea island, meaning most services terminated at Havant instead. Being a Sunday, less services are scheduled, but there's still plenty to keep the signaller occupied!
  
confirmed, superuser, Administrators
1,177

edits