Changes

1,414 bytes added ,  22:13, 11 March 2022
Created page with "{{Infobox ROSProject | name = Cambrian Line | description = The Cambrian Line from Sutton Bridge Junction to Aberystwyth and Pwlheli | country = {{flagu|United King..."
{{Infobox ROSProject
| name = Cambrian Line
| description = The Cambrian Line from Sutton Bridge Junction to Aberystwyth and Pwlheli
| country = {{flagu|United Kingdom}}
| time_period = 2010s
| company = Transport for Wales
| difficulty = 4
| author = Mark Jones
| website = [https://www.railwayoperationsimulator.com/catalog/community-projects/united-kingdom/cambrian-line Cambrian Line]
| map = {{Cambrian Line Route}}
}}
The Cambrian Line (Welsh: Llinell Cambria) is a railway from Shrewsbury (in Shropshire, England) to Welshpool, Aberystwyth and Pwllheli.

It was the first route in the UK to be converted to ETCS, with a special fleet of class 158s used to operate the route.

== Timetable ==

The standard service pattern is as follows:

{| class="wikitable"
| colspan="4"; style="text-align: center" | '''Cambrian Line Services'''
|-
| style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)'''
|-
| rowspan="2"; style="background:#{{National Rail colour|Transport for Wales Rail}}; color: white" | Transport for Wales
| Birmingham International || Aberystwyth || 0.5
|-
| Machynlleth || Pwlheli || 0.5
|}

Pwlheli services join/split from Aberystwyth services at Machynlleth.

[[Category:Simulations in the United Kingdom]]
confirmed, superuser, Administrators
1,177

edits