Darlington and Middlesbrough

From Railway Operation Simulator Wiki
Revision as of 01:53, 26 March 2022 by Oxalin (talk | contribs) (Created page with "{{Infobox ROSProject | name = Darlington and Middlesbrough | description = A simulation of the routes which encompass the birthplace of railways, the Darlington to Stoc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Darlington and Middlesbrough
DescriptionA simulation of the routes which encompass the birthplace of railways, the Darlington to Stockton line
Country United Kingdom
Time period2020
Train Operating CompanyNorthern, Transpennine Express, London North Eastern Railway, CrossCountry
Simulation difficulty6/10 stars
AuthorJosco
WebsiteDarlington and Middlesbrough
Route map

Saltburn
Redcar Yard
Redcar Central
Redcar Terminal
Wilton Terminal
East Coast Main Line
South Bank
Bishop Auckland
Tees Dock
Shildon Yard
Sunderland
Shildon
Whitby
Newton Aycliffe
Hartlepool
Heighington
Middlesbrough
Hitachi Works
Middlesborough Freight
North Road
Seaton Carew
Darlington Up Sidings
Billingham
Darlington Workshop
Tees New Yard
Darlington
Thornaby
Darlington Down Sidings
Stockton
Stockton Workshops
Tees Yard
Darlington Down Loop
Dinsdale
Teesside Airport
Eaglescliffe
Allens West
Yarm
Low Gates
Northallerton West
Northallerton
East Coast Main Line

The original thrust of this simulation was to create routes which covered the Darlington to Stockton line. This has led to the simulation covering:- – Darlington to Middlesbrough (and coastal stations) – East Coast line passing through Darlington and Northallerton stations – York to Redcar/Saltburn via Middlesbrough – Middlesbrough to Newcastle via Hartlepool

There is plenty of freight traffic particularly around the Middlesbrough area but also on the East Coast line.

Timetable

There are two timetables; one mimics a 0000 to 0800 nightshift which is a gentle introduction to the routes. The dayshift timetable covers 0800 to 1600 and is a far greater test of signalling skills. The timetables have been run with over 95% accuracy and they are based on 2020 schedules for the routes.

The timetables also have a number of repair trains sited at different locations throughout the map. This is to allow for a greater signalling challenge should you choose to use the failed trains setting.

All trains have platforming information contained in the train descriptions and again are taken from the real life schedules.

The standard off-peak service pattern is given below:

Darlington and Middlesbrough Services
Train Operating Company Origin Destination Frequency (tph)
Northern Saltburn Darlington 1
Bishop Auckland 1
Hexham Nunthorpe 1
Middlesborough Whitby 6tpd
Transpennine Express Manchester Airport Redcar Central 1
Liverpool Lime Street Edinburgh Waverley 1
London North Eastern Railway London King's Cross 2
CrossCountry Plymouth 1
Reading Newcastle 1