Difference between revisions of "North London Line"

From Railway Operation Simulator Wiki
Jump to navigation Jump to search
Line 16: Line 16:
 
| map        = {{{{PAGENAME}} Route}}
 
| map        = {{{{PAGENAME}} Route}}
 
}}
 
}}
This is a representation of the North London Line around the year 2023, at this time the route is operated by Transport for London as part of the London Overground network.
+
This is a representation of the North London Line around the year 2023, at this time the route is operated by Transport for London as part of the London Overground network. Included within the simulation is the full route from Stratford to Richmond via Gospel Oak. Also included is the Gospel Oak to Barking Line as far as Barking, and the West London Line between Willesden Junction and Imperial Wharf. The included timetable provides a challenge with a few services already present on the map right from the the 05:30am start time.
  
Included within the simulation is the full route from Stratford to Richmond via Gospel Oak. Also included is the Gospel Oak to Barking Line as far as Barking, and the West London Line between Willesden Junction and Imperial Wharf.
+
The North London Line has evolved over the years, up until the late 1980s services also commenced at the now long since demolished London terminus of Broad Street. After the closure of the Broad Street to Dalston Junction services continued to operate from Richmond to the SouthWest of the capital, and North Woolwich in the east. Operations on the line were taken over in 1986 by Silverlink trains under their Metro franchise, which also included West London Line services from Willesden Junction to Clapham Junction, Gospel Oak to Barking Line services (the route at this time being unelectrified), and Watford DC Line services from London Euston to Watford Junction. From 2007 Transport for London took over all four routes which became part of its London Overground services. From 2010 the section of line between Shoreditch just north of Broad Street and Dalston Junction was re-opened to form part of the East London Line section with trains running onward to West Croydon and Crystal Palace. In 2018 the Gospel Oak to Barking Line was electrified with electric trains commencing operation in 2019, the line was extended beyond Barking to the new terminus of Barking Riverside in 2022.
 +
 
 +
As well as passengers services the network pays host to a range of interregional freight movements, providing an important corridor for routing freight across the city and connecting the north of the country with industry in the south.
  
 
== Timetable ==
 
== Timetable ==
Line 45: Line 47:
 
| Richmond || Upminster / Barking || 6
 
| Richmond || Upminster / Barking || 6
 
|}
 
|}
 +
 +
== Operational Tips ==
 +
* Close attention must be paid to not only the destination of services but also the time at which they are due. It is common for services to not be due at their next location for some time, meaning despite [[Railway Operation Simulator|RailOS]] indicating they are awaiting a clear route, these services should instead be held at their current location in order to allow a higher priority service to pass.
 +
* Pay close attention to services entering from the directory of Tilbury/Barking Riverside via Barking station. Only one service can pass along this line at a time, in general services alternate in direction. Services from Woodgrange Park are usually held at this location to await those coming from Barking.
 +
* Note the level crossing near Mitre Bridge Jn, you should aim to open this crossing in time for services coming from Wembley. As a rule, try to keep an eye on all entry points.
 +
* Make sure to route services correctly at Willesden Junction, Gunnersbury Junction, Mitre Bridge Junction and Gospel Oak.
 +
* Caledonian Road & Barnsbury is an island platform station, make sure to route stopping services correctly. Also make sure services which are timetabled to pause at Westbourne Road Junction do not block passenger trains. Acton Wells Junction has quite a few freight services entering then leaving the map (a couple even re-enter to/from Mitre Bridge Junction).
 +
* At Kensington (Olympia) passenger services heading towards Shepherd's Bush are routed into the platform (see timetable). Freight services are sent along the central bypass.
 +
* At any one time, no fewer than 5 services may state they require attention, however they may all not yet be due.
 +
* Just because there is lots of flashing does not mean you are doing badly! Focus on keeping services on time as opposed to all "happy".
  
 
[[Category:Simulations in {{#ifeq:United Kingdom|United Kingdom|the|}} United Kingdom]]
 
[[Category:Simulations in {{#ifeq:United Kingdom|United Kingdom|the|}} United Kingdom]]

Revision as of 12:36, 25 March 2023

North London Line
DescriptionThe map includes the North London Line, Gospel Oak to Barking Line, and West London Line.
Country United Kingdom
Time period2023
Train Operating CompanyLondon Overground, Southern, London Underground
Simulation difficulty8/10 stars
AuthorKrizar
RepositoryNorth London Line
WebsiteNorth London Line
Rolling Stock
Route map

Stratford
Great Eastern Main Line
Barking
London Tilbury & Southend Railway
High Meads Loop
Hackney Wick
Woodgrange Park
Homerton
Hackney Central
Great Eastern Main Line
Lea Valley Lines
Wanstead Park
Leytonstone High Road
Leyton Midland Road
Dalston Kingsland
Walthamstow Queen's Road
East London Line
Blackhorse Road
Canonbury
Lea Valley Lines
East Coast Main Line
South Tottenham
Highbury & Islington
Lea Valley Lines
Harringay Green Lanes
Caledonian Road and Barnsbury
East Coast Main Line
HS1 and East Coast Main Line
Crouch Hill
Upper Holloway
Camden Road
Upper Holloway Cripple Siding
West Coast Main Line
Midland Main Line
Kentish Town West
Gospel Oak
Hampstead Heath
Finchley Road & Frognal
West Hampstead
Brondesbury
Brondesbury Park
Kensal Rise
Kensal Green Turnback
West Coast Main Line
West Coast Main Line
Willesden Junction
West Coast Main Line
West Coast Main Line
Dudding Hill
North Pole Depot
Great Western Main Line
Shepherd's Bush
Kensington Olympia
Acton Central
LU District Line
South Acton
West Brompton
LU District Line
LU District Line
Imperial Wharf
Hounslow Loop
Clapham Junction
Gunnersbury
Kew Gardens
Richmond

This is a representation of the North London Line around the year 2023, at this time the route is operated by Transport for London as part of the London Overground network. Included within the simulation is the full route from Stratford to Richmond via Gospel Oak. Also included is the Gospel Oak to Barking Line as far as Barking, and the West London Line between Willesden Junction and Imperial Wharf. The included timetable provides a challenge with a few services already present on the map right from the the 05:30am start time.

The North London Line has evolved over the years, up until the late 1980s services also commenced at the now long since demolished London terminus of Broad Street. After the closure of the Broad Street to Dalston Junction services continued to operate from Richmond to the SouthWest of the capital, and North Woolwich in the east. Operations on the line were taken over in 1986 by Silverlink trains under their Metro franchise, which also included West London Line services from Willesden Junction to Clapham Junction, Gospel Oak to Barking Line services (the route at this time being unelectrified), and Watford DC Line services from London Euston to Watford Junction. From 2007 Transport for London took over all four routes which became part of its London Overground services. From 2010 the section of line between Shoreditch just north of Broad Street and Dalston Junction was re-opened to form part of the East London Line section with trains running onward to West Croydon and Crystal Palace. In 2018 the Gospel Oak to Barking Line was electrified with electric trains commencing operation in 2019, the line was extended beyond Barking to the new terminus of Barking Riverside in 2022.

As well as passengers services the network pays host to a range of interregional freight movements, providing an important corridor for routing freight across the city and connecting the north of the country with industry in the south.

Timetable

The included timetable provides a challenge with a few services already present on the map right from the the 05:30am start time.

North London Line Services
Train Operating Company Origin Destination Frequency (tph)
Southern Clapham Junction Watford Junction 1
London Overground Stratford 4
Richmond 4
Gospel Oak Barking Riverside 4
Highbury & Islington Crystal Palace 4
West Croydon 4
District Line Richmond Upminster / Barking 6

Operational Tips

  • Close attention must be paid to not only the destination of services but also the time at which they are due. It is common for services to not be due at their next location for some time, meaning despite RailOS indicating they are awaiting a clear route, these services should instead be held at their current location in order to allow a higher priority service to pass.
  • Pay close attention to services entering from the directory of Tilbury/Barking Riverside via Barking station. Only one service can pass along this line at a time, in general services alternate in direction. Services from Woodgrange Park are usually held at this location to await those coming from Barking.
  • Note the level crossing near Mitre Bridge Jn, you should aim to open this crossing in time for services coming from Wembley. As a rule, try to keep an eye on all entry points.
  • Make sure to route services correctly at Willesden Junction, Gunnersbury Junction, Mitre Bridge Junction and Gospel Oak.
  • Caledonian Road & Barnsbury is an island platform station, make sure to route stopping services correctly. Also make sure services which are timetabled to pause at Westbourne Road Junction do not block passenger trains. Acton Wells Junction has quite a few freight services entering then leaving the map (a couple even re-enter to/from Mitre Bridge Junction).
  • At Kensington (Olympia) passenger services heading towards Shepherd's Bush are routed into the platform (see timetable). Freight services are sent along the central bypass.
  • At any one time, no fewer than 5 services may state they require attention, however they may all not yet be due.
  • Just because there is lots of flashing does not mean you are doing badly! Focus on keeping services on time as opposed to all "happy".