Difference between revisions of "Setting Distances and Speeds"

From Railway Operation Simulator Wiki
Jump to navigation Jump to search
(Created setting distances and speed page)
 
(Added navbox)
Line 4: Line 4:
  
 
When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.
 
When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.
 +
 +
{{Navbox
 +
| name      = Building Railways
 +
| title      = [[Building Railways]]
 +
| listclass  = hlist
 +
| state      = {{{state|}}}
 +
| group1    = Tools and Features
 +
| list1      =
 +
* [[Preferred Directions]]
 +
* [[Setting Distances and Speed]]
 +
* [[Element Editing Tools]]
 +
* [[Location Naming]]
 +
* [[Connecting Gaps]]
 +
* [[User Graphics]]
 +
| group2    = Element Types
 +
| list2      =
 +
* [[Basic Track Elements]]
 +
* [[Junctions]]
 +
* [[Signals]]
 +
* [[Continuations]]
 +
* [[Level Crossings]]
 +
* [[Stations and Locations]]
 +
* [[Portals]]
 +
}}

Revision as of 17:34, 10 May 2021

Although not strictly necessary, setting the distances and speeds to each element is very important to ensure that timetable is accurate, especially on a route imitating a real-life route.

This is done using the "Check & Set track element lengths & speed limits" tool, and can only be completed on a successful completion of the route, although this can be done before locations are named.

When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.