Difference between revisions of "Setting Distances and Speeds"

From Railway Operation Simulator Wiki
Jump to navigation Jump to search
(Moved navbox to a separate template)
 
Line 5: Line 5:
 
When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.
 
When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.
  
{{Navbox
+
{{Building Railways Navbox}}
| name      = Building Railways
 
| title      = [[Building Railways]]
 
| listclass  = hlist
 
| state      = {{{state|}}}
 
| group1    = Tools and Features
 
| list1      =
 
* [[Preferred Directions]]
 
* [[Setting Distances and Speed]]
 
* [[Element Editing Tools]]
 
* [[Location Naming]]
 
* [[Connecting Gaps]]
 
* [[User Graphics]]
 
| group2    = Element Types
 
| list2      =
 
* [[Basic Track Elements]]
 
* [[Junctions]]
 
* [[Signals]]
 
* [[Continuations]]
 
* [[Level Crossings]]
 
* [[Stations and Locations]]
 
* [[Portals]]
 
}}
 

Latest revision as of 17:40, 10 May 2021

Although not strictly necessary, setting the distances and speeds to each element is very important to ensure that timetable is accurate, especially on a route imitating a real-life route.

This is done using the "Check & Set track element lengths & speed limits" tool, and can only be completed on a successful completion of the route, although this can be done before locations are named.

When setting distances and speed limits, a section of track can be selected, and a combined length and speed limit can be entered. The length is split equally between all track elements in the selection.