Changes

no edit summary
Line 17: Line 17:  
* In terminating a shuttle early to link to a follow-on service the program gave the message ‘no follow-on service’ when there was in fact such a service.
 
* In terminating a shuttle early to link to a follow-on service the program gave the message ‘no follow-on service’ when there was in fact such a service.
 
* When a green route that immediately followed a blue route was truncated from the front the signal at the end of the blue route stayed green instead of changing to red as it should have done.
 
* When a green route that immediately followed a blue route was truncated from the front the signal at the end of the blue route stayed green instead of changing to red as it should have done.
 +
}}
 +
 +
{{Program Version
 +
| patch = 1
 +
| release_date = 2025-06-08
 +
| changes =  
 +
* Timetable error messages that involve illegal events are now more explicit. The event that causes the validator to fail is now given as well as the earlier event.
 +
* A train that starts with zero speed and is created under signaller control (one that has ‘S’ after the Snt location) remains ‘stopped on signaller’s instruction’ when it isn’t at a named location rather than starting to accelerate.
 +
* Bug fixed where a train without power that is joined by a powered train still identified as without power so couldn't move.
 
}}
 
}}
confirmed, superuser, Administrators
1,393

edits