Difference between revisions of "MRT Jakarta Phase 1"

From Railway Operation Simulator Wiki
Jump to navigation Jump to search
(Created Page)
 
(Added project details)
 
Line 1: Line 1:
 
{{Infobox ROSProject
 
{{Infobox ROSProject
 
| name        = {{PAGENAME}}
 
| name        = {{PAGENAME}}
| description =  
+
| description = A simulation of one of the rail-based public transportation systems in Jakarta, Indonesia.
 
| country    = {{flagu|Indonesia}}
 
| country    = {{flagu|Indonesia}}
 
| time_period = 2023
 
| time_period = 2023
 
| company    = PT Mass Rapid Transit Jakarta
 
| company    = PT Mass Rapid Transit Jakarta
 
| rolling_stock =
 
| rolling_stock =
*  
+
* MRTJ 1000 Series
*
 
 
| difficulty  = 2
 
| difficulty  = 2
 
| author      = Math
 
| author      = Math
| repository  = [________ {{PAGENAME}}]
+
| website    = [https://www.railwayoperationsimulator.com/catalog/community-projects/asia-pacific/mrt-jakarta-phase-1 {{PAGENAME}}]
| website    = [________ {{PAGENAME}}]
 
 
| map        = {{{{PAGENAME}} Route}}
 
| map        = {{{{PAGENAME}} Route}}
 
}}
 
}}
 +
MRT Jakarta is one of the public transportation systems in Jakarta province, Indonesia that has its own dedicated line.
 +
 +
MRT Jakarta has 13 stations (6 underground stations and 7 elevated stations), and 16 trainsets (2 standby trainsets as reserves). The waiting time between trains in MRT Jakarta is usually 10 minutes during normal hours and 5 minutes during peak hours. These trains utilize the CBTC signaling system and are equipped with Automatic Train Operation (ATO) GoA 2, with drivers operating the doors and driving in case of emergency.
  
 
== Timetable ==
 
== Timetable ==
 +
In this simulation, a timetable that applies on weekdays from 04:50 to 24:09 has been provided, which is the original schedule according to reality.
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 22: Line 24:
 
| style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)'''
 
| style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)'''
 
|-
 
|-
| rowspan="2"; style="background:#{{National Rail colour|PT Mass Rapid Transit Jakarta}}; color: white" | PT Mass Rapid Transit Jakarta
+
| PT Mass Rapid Transit Jakarta || MRT Bundaran Hotel Indonesia || MRT Lebak Bulus Grab || 12
|  
 
 
|}
 
|}
  
 
== Operational Tips ==
 
== Operational Tips ==
 
+
During operation the following points should be noted:
== Trivia ==
+
* Pay attention to the departure time of each train at 3 stations with manual entry and exit signals (Lebak Bulus Grab, Blok M BCA, and Bundaran Hotel Indonesia), because the change direction time of each train schedule may vary.
 +
* Platform 2 of Blok M BCA Station is only used for initial departure, final arrival, and conditions when there is a disruption. Besides that, please only use Platform 1 and Platform 3.
  
 
[[Category:Simulations in {{#ifeq:Indonesia|United Kingdom|the|}} Indonesia]]
 
[[Category:Simulations in {{#ifeq:Indonesia|United Kingdom|the|}} Indonesia]]
 
[[Category:PT Mass Rapid Transit Jakarta]]
 
[[Category:PT Mass Rapid Transit Jakarta]]

Latest revision as of 12:18, 15 September 2024

MRT Jakarta Phase 1
DescriptionA simulation of one of the rail-based public transportation systems in Jakarta, Indonesia.
CountryTemplate:Country data Indonesia
Time period2023
Train Operating CompanyPT Mass Rapid Transit Jakarta
Simulation difficulty2/10 stars
AuthorMath
WebsiteMRT Jakarta Phase 1
Rolling Stock
  • MRTJ 1000 Series
Route map

M-13 Sta.
MRT Bundaran Hotel Indonesia
M-12 Sta.
MRT Dukuh Atas BNI
M-11 Sta.
MRT Setiabudi Astra
M-10 Sta.
MRT Bendungan Hilir
M-09 Sta.
MRT Istora Mandiri
M-08 Sta.
MRT Senayan
M-07 Sta.
MRT ASEAN
M-06 Sta.
MRT Blok M BCA
M-05 Sta.
MRT Blok A
M-04 Sta.
MRT Haji Nawi
M-03 Sta.
MRT Cipete Raya
M-02 Sta.
MRT Fatmawati Indomaret
M-01 Sta.
MRT Lebak Bulus Grab
Lebak Bulus Siding
Lebak Bulus Depot and Stabling
Lebak Bulus Stabling Siding

MRT Jakarta is one of the public transportation systems in Jakarta province, Indonesia that has its own dedicated line.

MRT Jakarta has 13 stations (6 underground stations and 7 elevated stations), and 16 trainsets (2 standby trainsets as reserves). The waiting time between trains in MRT Jakarta is usually 10 minutes during normal hours and 5 minutes during peak hours. These trains utilize the CBTC signaling system and are equipped with Automatic Train Operation (ATO) GoA 2, with drivers operating the doors and driving in case of emergency.

Timetable

In this simulation, a timetable that applies on weekdays from 04:50 to 24:09 has been provided, which is the original schedule according to reality.

MRT Jakarta Phase 1 Services
Train Operating Company Origin Destination Frequency (tph)
PT Mass Rapid Transit Jakarta MRT Bundaran Hotel Indonesia MRT Lebak Bulus Grab 12

Operational Tips

During operation the following points should be noted:

  • Pay attention to the departure time of each train at 3 stations with manual entry and exit signals (Lebak Bulus Grab, Blok M BCA, and Bundaran Hotel Indonesia), because the change direction time of each train schedule may vary.
  • Platform 2 of Blok M BCA Station is only used for initial departure, final arrival, and conditions when there is a disruption. Besides that, please only use Platform 1 and Platform 3.