Difference between revisions of "Emerson Park"
m (Updated TOC categories) |
m (Added rolling stock) |
||
Line 5: | Line 5: | ||
| time_period = 2022 | | time_period = 2022 | ||
| company = London Overground | | company = London Overground | ||
+ | | rolling_stock = | ||
+ | * [[Electric Multiple Units of the United Kingdom#Class 710|Class 710]] | ||
| difficulty = 1 | | difficulty = 1 | ||
| author = [[User:Oxalin|Oxalin]] | | author = [[User:Oxalin|Oxalin]] |
Latest revision as of 11:05, 30 August 2022
Emerson Park | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Description | The Romford to Upminster Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Country | United Kingdom | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Time period | 2022 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train Operating Company | London Overground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Simulation difficulty | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Author | Oxalin | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Emerson Park | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling Stock | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Emerson Park is the only station located on a 3 mile single track branch line between Romford and Upminster. The line is currently operated by London Overground, linking with TfL Rail and Greater Anglia services at Romford, and District Line and C2C services at Upminster.
Timetable
The line operates at a 30 minute frequency throughout the day, and with the exception of the train arriving from Ilford depot in the morning and returning in the evening operates a single train, completely disconnected from the rest of the UK rail network.
Emerson Park Services | |||
Train Operating Company | Origin | Destination | Frequency (tph) |
London Overground | Romford | Upminster | 2 |
Trivia
Creation of the route took less than an hour from initial concept to operational timetable, and it is possibly the simplest route in ROS. It can easily be run on x16 speed, with each service requiring a route set through two signals.