Difference between revisions of "Elizabeth Line"

From Railway Operation Simulator Wiki
Jump to navigation Jump to search
m (Updated TOC categories)
 
(One intermediate revision by one other user not shown)
Line 5: Line 5:
 
| time_period = 2022
 
| time_period = 2022
 
| company    = Elizabeth Line
 
| company    = Elizabeth Line
 +
| rolling_stock =
 +
* [[Electric Multiple Units of the United Kingdom#Class 345|Class 345]]
 
| difficulty  = 4
 
| difficulty  = 4
 
| author      = Ben Wright
 
| author      = Ben Wright
Line 11: Line 13:
 
}}
 
}}
 
This layout simulates the central section of the Elizabeth Line, running through newly opened tunnels under, in the summer of 2022.
 
This layout simulates the central section of the Elizabeth Line, running through newly opened tunnels under, in the summer of 2022.
 +
 +
[[File:Elizabeth_line_roundel.svg|thumb]]
  
 
The line operates a service between Paddington and Abbey Wood. At this time services do not continue past Paddington or towards Shenfield from the tunnels, instead requiring a change at Paddington or Liverpool Street, with further services running from the mainline stations.
 
The line operates a service between Paddington and Abbey Wood. At this time services do not continue past Paddington or towards Shenfield from the tunnels, instead requiring a change at Paddington or Liverpool Street, with further services running from the mainline stations.
  
== Timetable ==
+
==Timetable==
 
The timetable simulated here has a peak service frequency of 12 trains per hour in each direction, with a timetable start of 4:20, running to around midnight.
 
The timetable simulated here has a peak service frequency of 12 trains per hour in each direction, with a timetable start of 4:20, running to around midnight.
  
 
{| class="wikitable"
 
{| class="wikitable"
| colspan="4"; style="text-align: center" | '''{{PAGENAME}} Services'''
+
| colspan="4" style="text-align: center" ; |'''{{PAGENAME}} Services'''
 
|-
 
|-
| style="text-align: center" | '''Train Operating Company''' || style="text-align: center" | '''Origin''' || style="text-align: center" | '''Destination''' || style="text-align: center" | '''Frequency (tph)'''
+
| style="text-align: center" |'''Train Operating Company'''|| style="text-align: center" |'''Origin'''|| style="text-align: center" |'''Destination'''|| style="text-align: center" |'''Frequency (tph)'''
 
|-
 
|-
| style="background:#9364cc; color: white" | Elizabeth Line
+
| style="background:#9364cc; color: white" |Elizabeth Line
| London Paddington || Abbey Wood || 12
+
|London Paddington||Abbey Wood||12
 
|}
 
|}
  
== Operational Tips ==
+
==Operational Tips==
 
This simulation can be run at higher rates in early or late hours, but during normal operations is only possible to operate at real speed.
 
This simulation can be run at higher rates in early or late hours, but during normal operations is only possible to operate at real speed.
  
 
[[Category:Simulations in the United Kingdom]]
 
[[Category:Simulations in the United Kingdom]]
 
[[Category:Elizabeth Line]]
 
[[Category:Elizabeth Line]]

Latest revision as of 11:02, 30 August 2022

Elizabeth Line
DescriptionThis is a layout of the central section of the Elizabeth Line, between Paddington and Abbey Wood
Country United Kingdom
Time period2022
Train Operating CompanyElizabeth Line
Simulation difficulty4/10 stars
AuthorBen Wright
WebsiteElizabeth Line
Rolling Stock
Route map

Great Western Main Line
Westbourne Park Sidings
Paddington
Bond Street
Tottenham Court Road
Farringdon
Liverpool Street
Whitechapel
Stepney Green Junction
Great Eastern Main Line
Canary Wharf
Canning Town
Custom House
Prince Regent
Beckton
Woolwich
Plumstead Carriage Sidings
Lewisham and Greenwich
Abbey Wood
Abbey Wood Crossrail Siding
Dartford

This layout simulates the central section of the Elizabeth Line, running through newly opened tunnels under, in the summer of 2022.

Elizabeth line roundel.svg

The line operates a service between Paddington and Abbey Wood. At this time services do not continue past Paddington or towards Shenfield from the tunnels, instead requiring a change at Paddington or Liverpool Street, with further services running from the mainline stations.

Timetable

The timetable simulated here has a peak service frequency of 12 trains per hour in each direction, with a timetable start of 4:20, running to around midnight.

Elizabeth Line Services
Train Operating Company Origin Destination Frequency (tph)
Elizabeth Line London Paddington Abbey Wood 12

Operational Tips

This simulation can be run at higher rates in early or late hours, but during normal operations is only possible to operate at real speed.