Changes

89 bytes removed ,  23:12, 26 August 2022
no edit summary
Line 5: Line 5:  
| time_period = 2010s
 
| time_period = 2010s
 
| company    = London Underground
 
| company    = London Underground
 +
| rolling_stock =
 +
* [[London Underground Multiple Units#A60 & A62 Stock|LU A60 & A62 Stock]]
 +
* [[London Underground Multiple Units#S7 & S8 Stock|LU S7/8 Stock]]
 
| difficulty  = 7
 
| difficulty  = 7
 
| author      = Joshua Coupe, Albert Ball
 
| author      = Joshua Coupe, Albert Ball
Line 36: Line 39:  
|}
 
|}
   −
== Trivia ==
+
[[Category:London Underground Simulations]]
Creation of the route took less than an hour from initial concept to operational timetable, and it is possibly the simplest route in ROS. It can easily be run on x16 speed, with each service requiring a route set through two signals.
  −
 
  −
[[Category:Simulations in the United Kingdom]]
 
confirmed, superuser, Administrators
1,598

edits